You will learn to
- Test the finished project and record the results.
- Evaluate the project against your success list and your audience's needs.
- Demonstrate the project to the class and explain one problem you solved.
Year 11 · ICT · After the exams · Lesson 4 of 5
Success criteria
You have got it when you can say:
- I can show which lines of my success list are met, and which are not.
- I can name one improvement I would make with more time.
- I can present my project and answer one question about it.
Year 11 · ICT · After the exams · Lesson 4 of 5
Retrieval starter
Questions from before. Write your answers, then show them.
- Last unit
Keeping the aspect ratio means…
A The image is croppedB Width and height change together so nothing stretchesC Only the width changes
B. Width and height change together so nothing stretches
- Earlier this year
Landscape orientation is…
A SquareB Taller than it is wideC Wider than it is tall
C. Wider than it is tall
- Last year
In mail merge, the master document holds…
A The list of namesB The envelopeC The letter with the merge fields
C. The letter with the merge fields
Year 11 · ICT · After the exams · Lesson 4 of 5
Key words (1 of 4)
- Questionnaire
- A set of written questions given to many people to collect their views.
- System specification
- A list of the hardware and software the new system needs.
- Field
- One item of data in a record, such as Surname.
- Validation
- An automatic computer check that data is sensible and allowed.
Year 11 · ICT · After the exams · Lesson 4 of 5
Key words (2 of 4)
- Check digit
- An extra digit calculated from the other digits, used to detect input errors.
- Data capture form
- A paper or on-screen form used to collect data.
- Test plan
- A table listing each test, its data, the expected and actual outcomes and any remedial action.
- Normal data
- Sensible data that should be accepted.
Year 11 · ICT · After the exams · Lesson 4 of 5
Key words (3 of 4)
- Abnormal data
- Data that should be rejected, such as out of range or the wrong type.
- Extreme data
- Data at the limits of the allowed range, which should be accepted.
- Live data
- Real data from the organisation, used to test the system with known results.
- Remedial action
- What was done to fix a test that failed.
Year 11 · ICT · After the exams · Lesson 4 of 5
Key words (4 of 4)
- Evaluation
- Judging the finished system against the original requirements after it has been used.
7.3 Development and testing · The explanation · step 1 of 6 · part 1 of 2
Why test, and the test strategy
Development means building the system: creating the file structures, forms, validation and reports.
Testing checks that the system works as the design says, and that it handles mistakes without crashing.
A test strategy decides what is tested and in what order: each module (a separate part), then each function (one task, such as 'record a loan'), then the whole system working together.
7.3 Development and testing · The explanation · step 1 of 6 · part 2 of 2
Why test, and the test strategy (continued)
Testing small parts first makes errors easy to find. If the whole system fails at once, the fault could be anywhere.
7.3 Development and testing · The explanation · step 2 of 6 · part 1 of 3
Types of test data
Normal data is sensible data that the system should accept.
Abnormal data is data that should be rejected: outside the range or the wrong type. Some books call it erroneous data.
Extreme data is data at the very limits of what is allowed. It should be accepted.
Computer Science 0478 also uses boundary data: the limit value and the value immediately beyond it. ICT 0417 asks for normal, abnormal and extreme.
7.3 Development and testing · The explanation · step 2 of 6 · part 2 of 3
Types of test data (continued)
| Field rule | Normal | Extreme | Abnormal |
|---|---|---|---|
| Exam mark 0 to 100 | 56, 73 | 0, 100 | 101, −5, 'sixty' |
| Year group 7 to 13 | 9, 11 | 7, 13 | 6, 14, 'ten' |
| Loan length 1 to 21 days | 14 | 1, 21 | 0, 22, 3.5 |
7.3 Development and testing · The explanation · step 2 of 6 · part 3 of 3
Types of test data (continued)
Extreme data is accepted. Students often think extreme means 'too big'. Too big is abnormal.
There is something to try for this step in the IGCSE library.
7.3 Development and testing · The explanation · step 3 of 6 · part 1 of 3
The test plan
A test plan is a table written before testing. Each row is one test.
The first columns are: what is being tested, the test data and the type of data.
Then come the expected outcome (what should happen), the actual outcome (what did happen) and the remedial action (what was done to fix a failure).
If the actual outcome matches the expected outcome, the test passes. If not, the system is fixed and the test is run again.
7.3 Development and testing · The explanation · step 3 of 6 · part 2 of 3
The test plan (continued)
| Test | Test data | Type | Expected outcome | Actual outcome | Remedial action |
|---|---|---|---|---|---|
| Mark field range 0 to 100 | 56 | Normal | Accepted | Accepted | None needed |
| Mark field range 0 to 100 | 0 | Extreme | Accepted | Accepted | None needed |
| Mark field range 0 to 100 | 100 | Extreme | Accepted | Rejected with error | Changed rule from <100 to <=100, retested: accepted |
| Mark field range 0 to 100 | 101 | Abnormal | Rejected, error message 'Mark must be 0 to 100' | Rejected, message shown | None needed |
| Mark field range 0 to 100 | sixty | Abnormal | Rejected, error message 'Enter a number' | Accepted and saved | Added type check, retested: rejected |
| Surname presence check | (left blank) | Abnormal | Rejected, 'Surname is required' | Rejected, message shown | None needed |
7.3 Development and testing · The explanation · step 3 of 6 · part 3 of 3
The test plan (continued)
Writing the expected outcome before testing stops the tester accepting whatever happens. The test plan also becomes evidence in the technical documentation.
7.3 Development and testing · The explanation · step 4 of 6 · part 1 of 2
Live data
Live data is real data from the organisation, such as last month's actual library loans.
After testing with made-up test data, the system is tested with live data whose results are already known from the old system.
If the new system gives the same results as the old one, it is working correctly with real-world data.
7.3 Development and testing · The explanation · step 4 of 6 · part 2 of 2
Live data (continued)
Live data contains real personal data, so it must be kept secure during testing.
7.6 Evaluation · The explanation · step 5 of 6 · part 1 of 2
What evaluation checks
Evaluation happens after the system has been in use for a while. It asks: does the new system do the job well?
Efficiency: is it faster or cheaper than the old system? Does it use fewer resources?
Ease of use: can staff use it with little training? Do they make fewer mistakes?
Appropriateness: is it the right solution for this organisation and its problems?
7.6 Evaluation · The explanation · step 5 of 6 · part 2 of 2
What evaluation checks (continued)
The explanation · 1 more step
More on the lesson page
The lesson page has the rest of the explanation, step by step:
- How it is done and what comes next